Technical Papers

Case study: Media Luna paste system
3 April 2025

Case study: Media Luna paste system

Discover the unique challenges encountered and the difficult yet necessary decisions to ensure that Torex will have a world-class paste plant when backfill operations start-up in 2025.

by Brent Robitaille
Pressure filter collection systems: sizing and optimisation
3 April 2025

Pressure filter collection systems: sizing and optimisation

This paper covers the surge discharge rate calculations and provides control considerations to reduce downstream surge requirements and considers both the advantages and disadvantages of the various control options.

by Matt de Boer
A Holistic Approach to Large-scale Alternative Dewatered Tailings Management: Lessons from Case Studies
20 April 2024

A Holistic Approach to Large-scale Alternative Dewatered Tailings Management: Lessons from Case Studies

Large-scale alternative dewatered tailings applications are increasingly being considered in the mining industry in an era of water scarcity and focus on dam structural integrity. However, evaluating business cases for these applications is often ineffective when based on costs alone. This paper makes the case for a new, more holistic approach to create effective business cases for evaluating large-scale alternative dewatered tailings applications.

by Rachel Jansen
Design and commissioning of coal fly ash filter plant
26 April 2023

Design and commissioning of coal fly ash filter plant

This paper outlines the design process of a fly ash filtration, conveying, and truck loadout performed by Paterson & Cooke. Some vital issues discussed are deciding on what filter technology to use and designing to ensure continuous operation.

by Jason Hamelehle
Case study: Fruta del Norte paste plant
25 April 2023

Case study: Fruta del Norte paste plant

The design of this paste plant is unique, accounting for challenges in topography, a sensitive local environment and challenging feed tailings. Read more about the unique paste plant design.

by Leslie Correia
Optimal paste backfill specification development
23 April 2023

Optimal paste backfill specification development

The paper describes how, through the use of material test work data, relationships linking strength, rheology, and curing time performance criteria can determine the optimal paste backfill specification.

by Stephen Wilson
Reduction of strength losses in paste backfill with sludge cake
20 April 2023

Reduction of strength losses in paste backfill with sludge cake

In a study by P&C for a future mine located in the Iberian Pyrite Belt, an investigation into the addition of the mine waste water treatment precipitated cake (sludge cake) in the CPB was conducted in parallel to testing CBP without the inclusion of sludge cake (i.e. 100% tailings).

by Ignacio Bazan
Optimisation of cemented aggregate backfill at New Luika Gold Mine
10 May 2019

Optimisation of cemented aggregate backfill at New Luika Gold Mine

This paper presents a case study of an optimisation of a CAF material by the addition of tailings in order to increase the paste fraction of the material. The main aim was to decrease the angle of repose to improve filling ability in addition to decreasing the required binder content.

by Bruno Salvoldi
Gwalia mine – backfill system operational review
10 May 2015

Gwalia mine – backfill system operational review

This paper presents an overview of the review along with an assessment of the current and future reticulation systems, concluding from it a number of value-adding recommendations. Additionally, comment is made on best practice in paste fill system management.

by Stephen Wilson
A critical look at uniaxial test procedures applied in the backfill industry
14 May 2014

A critical look at uniaxial test procedures applied in the backfill industry

This paper compares the most commonly used UCS test procedures. The paper will then investigate the effect of the most important parameters influencing test results, such as specimen shape, size and aspect ratios, by presenting laboratory test results for a specifically designed test campaign.

by Bernardt van der Spuy
Paste backfill design case study — Efemçukuru project
11 October 2010

Paste backfill design case study — Efemçukuru project

Paterson & Cooke completed the basic engineering of the paste backfill reticulation system for Eldorado Gold’s Efemçukuru project in Turkey. This paper presents a case study of the project.

by Robert Cooke
Shear and Rheology Reduction for Flocculated Thickened Tailings
10 May 2009

Shear and Rheology Reduction for Flocculated Thickened Tailings

This paper presents the test work results with the purpose of initiating discussion regarding the importance of conditioning flocculated high density thickened tailings to minimise rheology for pumping and pipeline transportation.

by Carlos Salinas
Cabildo Mine Backfill System
8 April 2005

Cabildo Mine Backfill System

The paper presents a study conducted to establish the feasibility of placing tailings into the mine voids.

by Ray Martinson