• Services
    • Tailings & Mine Waste
    • Long-Distance Pipelines
    • Mine Backfill
    • Mineral Processing
    • Mine Services
    • Bulk Water Supply
    • Dredging & Marine Pipelines
    • Laboratory & Test Work
    • Engineering Services
  • Courses & Tools
    • Courses & Training
    • Tools
  • About
    • Our Company
    • Our Values
    • Our Affiliates
  • Our Experts
  • Articles
  • Careers
  • Contact Us

Paterson & Cooke

Paterson & Cooke

  • Services
    • Tailings & Mine Waste
    • Long-Distance Pipelines
    • Mine Backfill
    • Mineral Processing
    • Mine Services
    • Bulk Water Supply
    • Dredging & Marine Pipelines
    • Laboratory & Test Work
    • Engineering Services
  • Courses & Tools
    • Courses & Training
    • Tools
    • Backfill PRO
  • About
    • Our Company
    • Our Values
    • Our Affiliates
  • Contact

Author: Robert Cooke

Paste backfill design case study — Efemçukuru project

Paste backfill design case study — Efemçukuru project

Paterson & Cooke completed the basic engineering of the paste backfill reticulation system for Eldorado Gold’s Efemçukuru project in Turkey. This paper presents a case study of the project.

Energy induced rheology reduction of flocculated thickened tailings — pipeline system design methodology

Energy induced rheology reduction of flocculated thickened tailings — pipeline system design methodology

This case study from the Jabal Sayid Mine demonstrates how operating procedures, and particularly a well-designed exclusion zone with catchment berm, successfully mitigated the consequences of a wall failure.

High Concentration Tailings Transportation System Optimisation

High Concentration Tailings Transportation System Optimisation

This paper presents the findings of a study conducted to determine the optimum concentration for a high concentration tailings transportation system.

Recent Posts

  • Paterson & Cooke Chile Expands Laboratory Capabilities with Uniaxial Compressive Strength (UCS) Testing 7 August 2026
  • Paterson & Cooke’s Denver Laboratory celebrates ISO 9001 certification 24 July 2026
  • Delivering One of Morocco’s Most Significant Water Infrastructure Projects 7 July 2026
  • Why Mine Backfill Has Become Critical to the Future of Underground Mining 15 June 2026
  • Why Proper Sampling Matters in Mineral Processing Testing 21 May 2026

Services

  • Tailings & Mine Waste
  • Long-Distance Pipelines
  • Mine Backfill
  • Mineral Processing
  • Mine Services
  • Bulk Water Supply
  • Dredging & Marine Pipelines
  • Laboratory & Test Work
  • Engineering Services

Paterson & Cooke

  • Our Company
  • Our Values
  • Our Affiliates
  • Our Experts
  • Articles
  • Careers
  • Contact Us

Where we Operate

  • Africa
  • Australia
  • UK & Europe
  • North America
  • South America

Courses & Tools

  • Courses & Training
  • Tools

© 2026 Paterson & Cooke All Rights Reserved.

Paterson & Cooke Privacy Notice

Slump yield stress calculator
Calculate yield stress using Boger cylinder
Online Slurry Calculator
 
We use cookies to ensure that we give you the best experience on our website. By browsing our website, you accept the use of cookies as explained in our privacy notice.